Conduit Fill Calculator

PRO

NEC 314 & 352 Compliance

Conduit Fill Calculator is a Pro feature
Unlock all professional tools with VerElect Pro
Upgrade to Pro

Conduit Selection

Cables

Fill Analysis

Fill Percentage

14.8%
Maximum allowed: 40%

Compliant

✓ Conduit fill 14.8% is within 40% limit

Technical Details

Total Cable Area:31.50 in²
Conduit Area:213.00 in²

Calculation Steps

1. Conduit: 3/4" EMT

2. Internal area: 213 mm²

3. AWG #14 (3× THHN): 10.5 mm² × 3 = 31.5 mm²

4. Total cable area: 31.5 mm²

5. Fill percentage: 31.5 / 213 × 100 = 14.8%

6. Maximum allowed fill (3+ cables): 40%

7. ✓ Conduit fill 14.8% is within 40% limit

Formula

Fill % = (Total Cable Area / Conduit Area) × 100

NEC Requirements

NEC 352.22 (Conduit Fill)
  • • 1 wire: 53% max fill
  • • 2 wires: 31% max fill
  • • 3+ wires: 40% max fill
Installation Notes
  • • Use proper pulling lubricant
  • • Avoid sharp bends (>90°)
  • • Support per NEC 352.30